chore: commit the repo config the project actually runs under #209

Merged
john merged 1 commit from chore/repo-config into main 2026-08-18 09:53:36 +00:00
Owner

The committed repo layer still described the pre-cost-cut project: diff blocking, phase_diff and plan adjudicated, consult on, deepseek beside openai as a second reviewer, all eight risk surfaces, and three provider tier blocks.

None of that has been in force for a while. The whole v3.5.3 milestone ran under the stripped layer, and its own run record shows it: the diff trigger never fired, every review went to openai alone, and the phase-5 structural checkpoint offered no consult.

Leaving it uncommitted meant a fresh clone silently reverting to the expensive settings with nothing to say it had. The repo layer now carries only what this project actually pins - the three answered risk surfaces - and everything else resolves from the global layer or the stakes level.

The committed repo layer still described the pre-cost-cut project: `diff` blocking, `phase_diff` and `plan` adjudicated, consult on, deepseek beside openai as a second reviewer, all eight risk surfaces, and three provider tier blocks. None of that has been in force for a while. The whole v3.5.3 milestone ran under the stripped layer, and its own run record shows it: the `diff` trigger never fired, every review went to openai alone, and the phase-5 structural checkpoint offered no consult. Leaving it uncommitted meant a fresh clone silently reverting to the expensive settings with nothing to say it had. The repo layer now carries only what this project actually pins - the three answered risk surfaces - and everything else resolves from the global layer or the stakes level.
chore: commit the repo config the project actually runs under
All checks were successful
test / node-test (git, 22) (pull_request) Successful in 21s
test / node-test (git, 24) (pull_request) Successful in 22s
test / node-test (other, 22) (pull_request) Successful in 22s
test / node-test (other, 24) (pull_request) Successful in 22s
test / node-test (planning, 22) (pull_request) Successful in 1m9s
test / node-test (planning, 24) (pull_request) Successful in 1m7s
test / node-test (prose, 22) (pull_request) Successful in 26s
test / node-test (prose, 24) (pull_request) Successful in 27s
test / node-test (review, 22) (pull_request) Successful in 15s
test / node-test (review, 24) (pull_request) Successful in 15s
test / node-test (routing, 22) (pull_request) Successful in 23s
test / node-test (routing, 24) (pull_request) Successful in 24s
test / self-verify (pull_request) Successful in 12s
test / typecheck (pull_request) Successful in 15s
26caff6e4a
The committed layer still described the pre-cost-cut project: diff blocking,
phase_diff and plan adjudicated, consult on, deepseek beside openai as a second
reviewer, all eight risk surfaces, and three provider tier blocks. None of that
has been in force for a while - the whole v3.5.3 milestone ran under the stripped
layer, which is visible in its own record: the diff trigger never fired, every
review went to openai alone, and the structural checkpoint offered no consult.

Leaving it uncommitted meant a fresh clone silently reverting to the expensive
settings with nothing to say it had. The repo layer now carries only what this
project actually pins - the three answered risk surfaces - and everything else
resolves from the global layer or the stakes level.
john merged commit 3f32c31326 into main 2026-08-18 09:53:36 +00:00